From an inquiry to a scope you can act on

The sequence below is how we work. We describe it conditionally on purpose: construction timelines, permit outcomes, and engineering requirements depend on the property and the jurisdiction, and we will not put a number on them before they are known.

  1. 01

    Property and goals

    You tell us where the parcel is, how it is reached, what utilities exist, and what you want the structure to do. We would rather hear about the road and the well than about square footage.

    What comes out of it

    • Location and parcel context
    • Access and season notes
    • Intended use
    • Target size range
  2. 02

    Model and scope review

    We look at which of the ten models suit the site and the use, and where a plan would need to change. If none of them fit, we will say so.

    What comes out of it

    • Shortlist of models
    • Plan changes to consider
    • Open questions
  3. 03

    Site, engineering, and permit management

    Foundation, soil, drainage, snow and wind loads, and the local permit path all get checked. Where the written agreement includes it, A-Hut then manages the permitting work: preparing and coordinating the permit package, engaging the licensed engineers and design professionals your parcel requires, submitting or supporting submission to the authority having jurisdiction, responding to plan-review comments, and tracking the application. The jurisdiction still issues the permit, so approval and review time are not ours to promise.

    What comes out of it

    • Foundation direction
    • Structural requirements to engineer
    • Jurisdiction requirements
    • Permit package and submittal management, per agreement
  4. 04

    Proposal and next steps

    A written scope based on what the property allows, with the items still to be resolved named explicitly rather than buried.

    What comes out of it

    • Written scope
    • Sequence of next steps
    • Items still open

What we will not tell you

Things that depend on your property and jurisdiction

If you have been given firm answers on these before a site review, treat them carefully.

  • That any model can be built on any lot
  • A construction schedule before the permit path is known
  • A guarantee that permits will be issued
  • That a structure will be legally habitable or rentable
  • Engineering sign-off before a structural design exists
  • A price before the scope and site are defined

For the detail behind step one, read what a Colorado property review covers. If you are still comparing routes to a cabin, see model design, prefab kit, or log home.

Step one starts with an email.

Send the property details and we will begin the review.